400 RABBITS
NUNHEAD
Following the success of the Crystal Palace branch, the clients came to us with a second smaller site in the up and coming Nunhead neighbourhood. Presenting us with different challenges in terms of architecture this branch needed to be an evolved version of the brand.
Here we kept the pallete of colours including the landmark jade green on the façade and pushed textures further with tiles, primary blue shelving whilst keeping the shell pared back to keep costs down and allow the restaurant as much space to breathe as possible.